Project: US Federal Courthouse
General Contractor: Brasfield and Gorrie LLC
Contract Amount: $12,850,000.00
|
Project: Carrizo Springs High School Owner: Carrizo Springs ISD General Contractor: Bartlett Cocke Contract Amount: $6,130.000.00
As the Eagle Ford Shale area continues to grow, Aerohead is proud to be a part of that growth. This high school is an example of our ability to complete large, out of town projects with quality and on schedule. The K-12 market continues to provide a platform for our company to perform to our customer's expectations. Finishing this project in under one year showcases our ability to travel, and travel well. Reference: Craig Jendrusch with Bartlett Cocke
__________________________________________________________________________________
|
Project: SA Intermodal Owner: Union Pacific Railroad General Contractor: SpawGlass Contract Amount: $1,339,000
This project showcases our ability to perform unique and challenging work. This project involved the installation of over 14,000 feet of underground polypropylene compressed air piping. Additionally, two separate compressor stations were built and installed to supply the air for recharging the freight car air brakes along the railroad tracks at the junction. Reference: Grady Carlson with SpawGlass.
__________________________________________________________________________________
|
Project: St. Luke’s Phase II Owner: Baptist Health System General Contractor: Joeris GC Project Amount: $462,000
Aerohead has a proven track record of being successful with both large and small projects. Each one is given the same amount of dedication to quality and owner satisfaction. In this project, we remodeled 25 patient rooms, completely updated the HVAC, plumbing, and med-gas systems through out. Reference: Brian Kubena with Joeris GC.
__________________________________________________________________________________
|
Project: Ft. Sam BRAC Health Clinic Owner: USACOE General Contractor: Satterfield & Pontikes Project Amount: $6,308,000
At Aerohead, we have a long list of successful projects working with the Army Corps of Engineers. Our expertise working with the federal government was on display during the construction of this 170,000 square foot primary care health care facility. This project required a chilled water/hot water system and all plumbing. Showcasing our flexibility, Aerohead finished the project on a 4 month accelerated schedule at the request of the owner. Reference: George West with Satterfield & Pontikes.
__________________________________________________________________________________
|
Project: UTSA Combined Sciences Owner: UT OFPC General Contractor: Gilbane Contract Amount: $5,955,000
Aerohead demonstrated our ability to install extremely complex systems on this project. Here we installed two Tier 1 research laboratories, with a wash down perchloric acid exhaust system and a hydrochloric acid exhaust system. The labs also required three independent pure water systems as well as acid waste systems. The labs were supplied by a central plant featuring a two story state of the art energy recovery system. Aerohead met all OFPC and owner expectations. Reference: Eric Ireton with UTSA.
__________________________________________________________________________________
|
Project: ATC Airmen’s Dorm #1 Owner: USACOE General Contractor: Satterfield Pontikes Contract Amount: $12,000,000
This 300,000 square foot, 1,200 man dormitory displays Aerohead’s ability to handle larger projects with the utmost skill and attention to detail. This project required over 1,600 plumbing fixtures as well as a penthouse mechanical room with the latest energy efficient HVAC equipment and controls. This project featured a boiler room with 14 boilers producing a combined 46,000,000 btu’s of heating for the entire building. Reference: George West with Balfour Beatty/Satterfield Pontikes.
__________________________________________________________________________________
|
Project: Palo Alto Central Plant Owner: ACCD – Palo Alto General Contractor: SpawGlass Contract Amount: $1,342,000
Building central plants showcases Aerohead’s experience with first class water pipe installations. Here we built a 1,200 ton capacity central plant complete with 24 inch diameter condenser water pipe installed under a road to the cooling towers. When it comes to pipe installation, Aerohead can tackle every project requirement. Reference: Grady Franks with SpawGlass.
__________________________________________________________________________________
|
- Government
- US Federal Courthouse
- Hays County Public Safety Builidng
- US Postal Service
- US Army Corps of Engineers
- Texas Department of Transportation
- US Department of Labor
- GSA
- Lackland AFB
- Lackland Hanger 910
- City of San Antonio
- Bexar County
- City of Schertz
- Institutional / Commercial
- UTSA
- Indigo Hotel
- Retama Dorm Renovation
- North Park Audi
- Texas Oncology
- Project Tech
- Living Spaces SA Showroom
- ACCD Palo Alto
- Union Pacific Railroad
- Fiesta Texas
- Nationwide
- Kickapoo Nation
- Rivercenter Mall
- Healthcare
- US Army Corps of Engineers
- Baptist Health System
- Centromed
- Hill Country Memorial Hospital
- CHCS Inner City Clinic
- Education K-12
- San Antonio ISD
- Northside ISD
- Northeast ISD
- Poteet ISD
- Southside ISD
- Judson ISD
- Del Rio ISD
- Alamo Heights ISD
- New Braunfels ISD
- Schertz-Cibolo ISD
- Austin ISD
- Carrizo Springs ISD
- Comal ISD
- Northwest Vista Welcome Center
- Northwest Vista Parking Garage
|
|
|